Find the power developed if the head available is 90m and the overall efficiency of generation is 86 percent
Answers
Answered by
0
Explanation: If the head of water available is above 100m, the plant is known as a high head plant. IN this head, water available for producing electricity is very high and it can extend to 1000 meters.
Hydropower Engineering is comprehensive engineering knowledge (design, drawings, computations) of various components of a hydro-power project. ... Hydrology , Power Potential Studies.
Similar questions