find the total cost 9/4 meter of cloth at the rate of rupees 101/4 per meter and 66/5 meter of cloth at the rate of rupees 127/6 per meter
Answers
Answered by
0
Answer:
required total cost is 26897/80 rupees
Step-by-step explanation:
In the first case,
rate of per meter cloth is 101/4 rupees
then rate of 9/4 meter of cloth is 9/4×101/4 = 909/16 rupees
In the second case ,
rate of per meter cloth is 127/6 rupees
then rate of 66/5 meter of cloth is 66/5×127/6 = 1397/5
∴∴ Total cost =
= = 26897/80
Similar questions