For B.G. single track railway, the height of the tunnel above top of rails should be
A.5.5 m to 5.8 mB.5.8 m to 6.2 mC.6.7 m to 7.3 mD.7.3 m to 7.5 m
Answers
Answered by
1
Answer:
5. For B.G. single track railway, the height of the tunnel above top of rails should be. [A]. 5.5 m to 5.8 m. [B]. 5.8 m to 6.2 m. [C]. 6.7 m to 7.3 m, @. [D]. 7.3 m to 7.5 m ...
Answered by
0
The correct answer is option C) 6.7m to 7.3m
- A single-track railroad is a railroad where trains going in both directions share the same track.
- The single track is typically found on less-used railway lines, often on branch lines where traffic levels are not high enough to justify the cost of constructing and maintaining a second track.
- The conversion of a single-track railroad to a double-track is called doubling or doubling; the conversion from double track to single track is called singularization.
- A two-track railway that only runs on one track is referred to as a one-way operation.
- This involves the construction of three main types of track: tangent track (straight line), curved track, and track transition curve (also known as transition spiral or spiral), which creates a connection between a tangent track and a curve.
- Various engineering studies carried out for The choice of route for a new railway line survey can be roughly divided into three categories.
- Reconnaissance Survey: This is conducted in two categories namely Traffic Reconnaissance Survey and Engineering Reconnaissance Survey
- Preliminary Survey: Based on the preliminary reports and the traffic survey, the railway administration decides whether the planned railway line will be built or not.
- Final site study: Once the decision to build a specific railway line has been made, a final site study is carried out.
#SPJ3
Similar questions
Geography,
3 months ago
English,
3 months ago
Math,
3 months ago
Math,
6 months ago
English,
6 months ago
Psychology,
10 months ago
Math,
10 months ago
Social Sciences,
10 months ago