Math, asked by shawnedwardsregis1, 11 months ago

Four men can build a stone wall 32m long in 12 days. What length of the wall can 8
men, working at the same rate build in 8 days?

Answers

Answered by abaanasim23
7

Answer:

42 2/3 m

Step-by-step explanation:

Length of wall built by four men in 12 days = 32 m

Then length of wall built by four men in a single day = 32/12

                                                                                       = 8/3 m

And length of wall built by 1 man = 8/3 x 1/4

                                                       = 8/12

                                                       = 2/3 m

Now, length of wall built by 8 men in a single day = 2/3 x 8

                                                                                   = 16/3 m

And length of wall built by 8 men in 8 days = 16/3 x 8

                                                                        = 128/3 m  

                                                                        = 42 2/3 m

Plzz mark as brainliest

Answered by akshatbisht344
2

Answer: wall constructed by one man in 12 day =32/12

                                                                                =8/3m

wall constructed  by one man in 1 day=8/3 x 1/4

                                                      = 8/12

                                                      = 2/3 m

                                                           

wall constructed by 8 men in 8 days = 2/3X 8 X 8 m

                                                            =128/3 m

Similar questions