The initial cost of hydroelectric power generation is very high.
________________________________
don't spam and don't copy the answer from any source.​


livingston42: hi
Anonymous: hello
Anonymous: who are you?

Answers

Answered by livingston42
3

Answer:

because hydroelectric power generation is caused from the hydroelectricity which was made by water it and so how it caused how many voltage it will be give


Anonymous: hi
Anonymous: this answer is not proper
livingston42: am sorry
Answered by BrainlyPhantom
8

Answer:

The various equipment required for the setting up a hydroelectric plant needs latest technology. These parts and equipment are also very costly. Hence, the initial cost of setting up a hydroelectric power plant is very high even though we can produce electricity in a low-cost manner.

The construction and maintenance of the dam and turbine [two main parts of the power plant] is very expensive. Atleast 30 lakhs is required to set up a good hydroelectric powerplant.

Even though we can construct low cost plants. their efficiency may not be good. Hence, we can say that the  initial cost of hydroelectric power generation is very high.

Knowledge Bytes:

→ Hydropower plants produce electricity though harnessing water.

→ Dams, embankments and turbines are some of the parts of a hydropower plant.

→ In this type of power production, water is made to fall from a certain height. Through this, some amount of energy is produced which is harnessed and converted to electrical energy.


anindyaadhikari13: Nice answer.