The HVJ pipeline is a 1,750 Km pipeline grid set up to supply industrial and domestic gas to the states of Gujarat, Madhya Pradesh, Uttar Pradesh, Rajasthan, Haryana and NCT.
Fertiliser units in U.P. have benefited immensely from this project. Later, Indraprastha Gas Limited took over the supply of domestic gas to the NCT area. HVJ stands for Hazira, Vijaipur and Jagdishpur, the key industrial areas on the route of the pipeline.
The project was conceptualised by Gas Authority of India Limited (GAIL) in 1986.
Brainiest answer please..
Answer:
HVJ an abbreviation for Hazira-Vijaipur-Jagdishpur (also known as HBJ where B stands for Bijeypur, another name of Vijaipur) is India's first cross state gas pipeline. The project was started in 1986 after the incorporation of GAIL (India) Limited to supply gas to the fertilizer plants located in the state of Uttar Pradesh. The first phase of the project consisting of non-branched 1,750 kilometer grid was commissioned in 1997. Later on the system was expanded with additional branches to supply gas for industrial and domestic use in the states of Rajasthan, Haryana and NCT, which increased the total grid length to 3,474 km.