Total work content =
(A) Basic work content + Excess time
(B) Basic work content – Excess time
(C) Basic work content + Ineffective time
(D) Basic work content – Ineffective time

#Follow me :)

Answers

Answered by Anonymous
0

Total work content= Basic work content + Excess time (Option A)

  • The work content is concerned with the time taken to complete a task which is then calculated by using techniques of work measurement.
  • If the layout, equipment, design meet the standards, the time taken to finish the product is called the basic work content.
  • Similarly, the time lost during the production process due to employees being absent, defects in the layout, failure of equipment accounts for the excess time.
Answered by KomalSrinivas
0

The correct answer is a) Basic work content + Excess time.

  • The total work content refers to the time required to create a product using the recognized and traditional methods at a definite manufacturing level.
  • 'Basic work content' refers to the time required in production if all the conditions for producing the item were perfect.
  • 'Excess time' refers to the time lost due to delays, technical and mechanical errors, accidents, power shortage, lack of labor, and so on.
  • Thus, basic work content and excess time together make up the total work content.