Hi Friends !!
Total work content =
(A) Basic work content + Excess time
(B) Basic work content – Excess time
(C) Basic work content + Ineffective time
(D) Basic work content – Ineffective time
#Follow me :)
Answers
Answered by
0
Total work content= Basic work content + Excess time (Option A)
- The work content is concerned with the time taken to complete a task which is then calculated by using techniques of work measurement.
- If the layout, equipment, design meet the standards, the time taken to finish the product is called the basic work content.
- Similarly, the time lost during the production process due to employees being absent, defects in the layout, failure of equipment accounts for the excess time.
Answered by
0
The correct answer is a) Basic work content + Excess time.
- The total work content refers to the time required to create a product using the recognized and traditional methods at a definite manufacturing level.
- 'Basic work content' refers to the time required in production if all the conditions for producing the item were perfect.
- 'Excess time' refers to the time lost due to delays, technical and mechanical errors, accidents, power shortage, lack of labor, and so on.
- Thus, basic work content and excess time together make up the total work content.