Accountancy, asked by lalkishormahto1997, 1 year ago

How are standard fixed for material cost labour cost and overheads?

Answers

Answered by osoiekoduke
0

Answer:

There is a large relation and interconnection between the material cost and the labour cost in as far as determining the price index of the work in any given environment is concerned.

Explanation:

  • Normally the total material cost for instance in a building is the is the determinant of the total cost of the labour.
  • The total cost of the construction of the house for instance gives us the provision to charge on the labour cost as the constructors.
  • The total amount is normally determinant and the total labour cost is normally the thirty percent of the total cost.
  • The total cost of the construction is normally directly proportional to the labour cost.

Similar questions