How are standard fixed for material cost labour cost and overheads?
Answers
Answered by
0
Answer:
There is a large relation and interconnection between the material cost and the labour cost in as far as determining the price index of the work in any given environment is concerned.
Explanation:
- Normally the total material cost for instance in a building is the is the determinant of the total cost of the labour.
- The total cost of the construction of the house for instance gives us the provision to charge on the labour cost as the constructors.
- The total amount is normally determinant and the total labour cost is normally the thirty percent of the total cost.
- The total cost of the construction is normally directly proportional to the labour cost.