Mizoram's population was 1,091,014, according to a 2011 census. It is the 2nd least populous state in the country.[7] Mizoram covers an area of approximately 21,087 square kilometres.[8] About 91% of the state is forested.[9]

About 95% of the current population is of diverse tribal origins who settled in the state, mostly from Southeast Asia, over waves of migration starting about the 16th century but mainly in the 18th century.[10] This is the highest concentration of tribal people among all states of India, and they are currently protected under Indian constitution as a Scheduled Tribe.[11] Mizoram is one of three states of India with a Christian majority (87%).[12] Its people belong to various denominations, mostly Presbyterian in the north and Baptists in the south.

Mizoram is a highly literate agrarian economy. Slash-and-burn jhum, or shifting cultivation, is the most common form of farming here, though it gives poor crop yields.[13] In recent years, the jhum farming practices are steadily being replaced with a significant horticulture and bamboo products industry.[14][15] The state's gross state domestic product for 2012 was estimated at ₹6,991 crore (US$980 million).[8] About 20% of Mizoram's population lives below poverty line, with 35% rural poverty as of 2014.[16] The state has about 871 kilometres of national highways, with NH-54 and NH-150 connecting it to Assam and Manipur respectively. It is also a growing transit point for trade with Myanmar and Bangladesh.[

Explanation:

Mizoram is not self-sufficient in power. In 2012, the state had a demand for 107 MW of power, but had an effective installed capacity of only 29.35 MW. To bridge the gap, it purchased electricity from the national grid.[83]

Of the total installed power generation capacity, all 29.35 MW came from hydel. The state also has 22.92 MW of thermal power and 0.50 MW of Diesel generating set as of March 2012. The thermal and diesel generating stations were kept on standby mode owing to their high cost of operation, and because it was cheaper to buy the power from the national grid than to operate these standby units.[83]

The hydroelectric power potential of Mizoram was assessed to be about 3600 MW in 2010,[84] and about 4500 MW in 2012.[85] If even half of this is realised, the state could supply all its citizens and industry with 24/7 electricity, as well as earn income by selling surplus power to the national grid. The topography of Mizoram hydroelectric resources is ideal for power projects. The following rivers are suited for hydel projects with minimal impact on its biosphere - Tuivai, Tuivawl, Tlawng, Tut, Serlui, Tuirial, Kolodyne, Tuichang, Tuipui, Tiau and Mat. Beyond the major rivers, Mizoram has many small but perennial streams and rivulets with ideal condition for developing micro/mini and small hydroelectric projects.[84] The state has proposed projects to attract private investments on Build, Own, Operate and Transfer (BOOT) basis with financial assistance in rehabilitating its citizens were they to be affected by the project. The largest proposed project is expected to be on Kolodyne (460 MW), and there are dozens of small to micro projects that have been identified.[84]

By 2014, the state had signed memorandums to build and add 835 MW of electricity generation projects - Tuivai SHP with VGF (210 MW) in Champhai district, Kolodyne-II SHP with NHPC (460 MW) in Siaha district, Bairabi with Sikaria Power (80 MW) in Kolasib district, Tuirini with SPNL (38 MW) in Aizawl district, and Tuivawl with SPML as well (42 MW) in Aizawl district.