Detailed analysis on M20  = 1:1.5:3 (Ratio)As we know that  during concreting when we place wet concrete , it gets harden after certain standard time( 30 mins IST & 10hrs FST), considering same it had be decided upon by Civil design Engineers to take a factor of safety ranging from 1.54 to 1.57 to counter that shrinkage.i.e volume of dry Concrete = 1.54 to 1.57 times Volume of wet concrete.Now calculations is as follows for 1cum(assumed) of Concrete workratio Sum = 1+1.5+3=5.5 Shrinkage or safety Factor =1.57 (you can take 1.54 also)So Total volume of wet concrete required is :- 1.57cumVolume of broken stone Require = (3/5.5) x 1.57 = 0.856 m3Volume of sand Require = (1.5/5.5) x 1.57 = 0.471 m3Volume of cement = (1/5.5) x 1.57 = 0.285 m3 = 0.285 x1440 = 411 kg For 1m3 of M20 (1:1.5:3) Broken stone = 0.856 m3 Sand = 0.472 m3Cement = 8.22 bag.Some important conclusion from above 8 bag of Cement is required for 1cum of concrete work in M20.4.4 bag of cement is required for 1cum of concrete work in M10.volume of dry concrete =1.54 times volume of wet concrete.

Similar questions