How long should a steel component be heat treated before nitriding?
Answers
Answered by
0
Answer:
40 to 100 hours
Explanation:
Before nitriding is carried out, it is required that the workpieces are heat treated to produce the required properties in the core. The parts are heat treated at around 500°C for a period of 40 to 100 hours.
Answered by
0
A steel component be heat treated for 40-100 hours at a temperature of 500°C before nitriding.
Explanation:
- Nitriding is a process where nitrogen is coated on the surface to make it corrosion resistant or, simply rust-free.
- Before carrying out the nitriding process, the steel article must be intensely heated, so that the properties reach to the core.
- The whole process of heating takes place in a gas tight chamber where ammonia gas is circulated.
To know more:
In nitriding process of heat treatment the steel components are heated in the presence of
https://brainly.in/question/8978818