how long will 50 men take to do the same job that 40 men do in 25 days
Answers
Answered by
14
Answer:
40 men —25 days
1 man - 40*25 days=1000 days
50 men=1000/50 days
=20 days
So 50 men require 20 days to complete that job.
Answered by
3
Answer:
Work is done by 40 men = 25 days
" " " " 1 men = 40*25/1
" " " " 50 men=40*25/50
= 20 days