how many cubic metres of concrete is required to lay a path 125m long 60cm wide and 10cm thick
Answers
Answered by
0
Answer:
please mark me as brainliest
Step-by-step explanation:
7.5 cubic meters of concrete is required to lay a path.
It is given that a path 125m long, 60cm wide and 10 cm thick. Therefore, 7.5 cubic meters of concrete is required to lay a path. Find the volume of cuboid if surface area is 208 and ratio of length , breadth, height is 2, 3, 4