how much land is required to setup wind mill to generate 1 megawatt of power
Answers
Answered by
2
Answer:
In the United States, the direct land use for wind turbines comes in at three-quarters of an acre per megawatt of rated capacity. That is, a 2-megawatt wind turbine would require 1.5 acres of land.
please make me brainlest
only one brainlest to go to next level
Answered by
0
Explanation:
Wind turbines need an unchanging and uninterrupted flow or air to work effectively, which means there must be no obstructions nearby. Researchers have suggested that for residential wind turbines 150 meters away from nearby obstructions is enough. In the case of wind farm spacing, turbines need to be at least 7 rotor diameters away from each other.
Similar questions
English,
5 months ago
Social Sciences,
5 months ago
Science,
1 year ago
Accountancy,
1 year ago
Math,