For first block on the table the work is zero because it is already on the table
For second we lift it above the first block so we lift it one thickness h. So the work done on the second block is W2=mgh
For the third block we lift it above the previous two blocks so the work done is W3=mg(2h)=2mgh
For the last block we lift it above the previous three so the work done is W4=mg(3h)=3mgh
So the total work done is
Wtotal=W1+W2+W3+W4=0+mgh+2mgh+3mgh=(1+2+3)mgh=6mgh
Explanation:
I hope the answer is right and please mark me as Brilliant