How much time does it take to perform 500 J of work at a rate of 1 KW ?
Answers
Answered by
3
Answer:
does 500 J of work in 10 minutes and B does 600 J of work in 20 minutes. The power delivered by A and B is P1 and P2 respectively. Find the relation ...
Answered by
7
Given :
- Work = 500 J
- Power = 1 KW
To Find :
- The time taken
Solution :
The relation between Power , Work and time is given by ;
Hence ,
- The time taken to perform 500 J of work at the rate of 1 KW is 0.5 sec.
Similar questions