How much time would a machine take to put caps on 300 bottles?
Answers
Answered by
22
We can’t say the answer until we come to know the time it takes for machine to put the caps
Answered by
7
Answer: It takes 1.6 hours for the machine to put the cap on 300 bottles.
Step-by-step explanation:
The machine puts caps on 300 bottles in 480 minutes.
So the rate of machine is: rate = job/time which is equal to caps of bottle per minutes.
The time needed to put caps on 300 bottles manually is: time = job /rate which is equal to (bottle×minutes)/60 hours.
(480×60) /(60×300) = 1.6 hours.