Physics, asked by poojitha, 1 year ago

How much work done in moving 4C across two points having PD 10V ?

Answers

Answered by santy2
148
Change in potential difference V= Work done /charge (C)

Work done = potential difference(V) x Charge in coulombs(C)
                   
                  = 10v  x 4C
                
                  = 40 joules

Answered by patelvraj2397
34

Answer:work is done in moving a charge of 4C across two point having a potential difference of 10 volt is 40joule

Explanation:W=qv

q=4C

V=10v

Put this value in formula

W=4×10

=40joule

Similar questions