how much work is done in moving a charge of 2c across two points having a potential difference between 12v?
Answers
Answered by
1
v = w / q
Therfore
12 = w / 2
w = 24
Hence 24 Joules of work was done.
Hope it helps.
:)
Therfore
12 = w / 2
w = 24
Hence 24 Joules of work was done.
Hope it helps.
:)
Answered by
0
If you remember 12V potential difference can simply be taken as work done per unit charge to bring charge from a point of zero potential to a point of zero potential to a point with potential 12V in a electric field. Therefore to take 2C charge, work=12*2=24J Since you haven't give any direction that is why work is in modulus.
sakinamubin786:
i hope it help u
Similar questions