Physics, asked by lekhrajgurjar9666, 3 days ago

how much work is done in moving a charge of magnitude 3 C across two points having a potential difference of 12 v?​

Answers

Answered by binodbam2003
3

Answer:

Answer Expert Verified

The potential difference(p.d) between two point in an electric circuit is defined as the amount of work done in moving a unit charge from one point to the other point. Hence, the work done in moving the charge is 45 J.30-Dec-2017

Answered by RUHIADAHIR
2

The potential difference(p.d) between two point in an electric circuit is defined as the amount of work done in moving a unit charge from one point to the other point. Hence, the work done in moving the charge is 45 J.

Similar questions