Answered by flower161
0
In a traditional costing method, we calculate one plantwide allocation rate or we could calculate an overhead allocation rate for each department.  We have a three step process:

Step 1:  Determine the basis for allocating overhead or indirect costs.  These can be anything a company decides but most common are direct labor cost, direct labor hours, direct material usage or machine hours.

Step 2:  Calculated a predetermined overhead rate using estimates.  This is typically calculated at the end of the year to be used during the following year.  The formula we use for this is:

Predetermined Overhead Rate (POHR) = Estimated OverheadEstimated Base (or cost driver)

Step 3:  Apply overhead throughout the period using the actual amount of our base and the predetermined overhead rate (POHR) calculated in step 2.  We calculate this as:

Applied Overhead =Actual amount of base x POHR