How was the Dockyard constructed in Lothal?
Answers
Answered by
0
Explanation:
Lothal engineers studied tidal movements and their effects on brick-built structures and constructed kiln-burnt brick walls. ... Boats of 60-75 tonnes capacity and 20-25 metres in length could enter Lothal dock, which was designed in such a manner as to ensure berthing 20-30 boats of a fairly large size
Similar questions
Hindi,
1 month ago
Social Sciences,
1 month ago
Hindi,
1 month ago
English,
2 months ago
Math,
2 months ago
CBSE BOARD XII,
9 months ago
Social Sciences,
9 months ago