How will you calculate variable cost and fixed cost in flexible budget?
Answers
Answered by
0
Dividing total cost of each category by the budgeted production level results in variable cost per unit of $0.50 for indirect materials, $0.40 for indirect labor, and $0.40 for utilities. To compute the value of the flexible budget, multiply the variable cost per unit by the actual production volume.