if 10 men can dig a trench in 12 days how long will 4 men take to do the same work
Answers
Answered by
1
Answer:
if 10 men dig trench in 12 days
4men = 30 days
Answered by
1
given
total number of days=12
number of men who digged the trench=10
number of men to do the same work=4
that is,
10×(4÷12)
=10×3
=30
therefore the men will take 30 days to do the same work