If 10 men can do a peace of work in4 days how many men will be required to get the same work done in 5 days.
Answers
Answered by
0
Answer:
No. of men required to do a piece of work in 4 days = 10
No. of men required to do a piece of work in 4 × 5/4 = 5 days
= 10 ÷ 5/4 = 10 × 4/5 = 8
∴ 8 men are required.