if 10 men can do a piece of work in 4 days then how many men will be required to get
the same work done in 5 days
Answers
Answered by
48
No. of men required to do a piece of work in 4 days = 10
No. of men required to do a piece of work in 4 × 5/4 = 5 days
= 10 ÷ 5/4 = 10 × 4/5 = 8
∴ 8 men are required.
Hope this helps. ^_^
Thank you. :-))
Answered by
20
Answer:
no of men required to a piece of work on 4 day= 10
no of men required to do a piece of work in 4×5/4= 5 day
= 10÷5/4=10×4/5=8
8 men are required
Similar questions