If 100 men take 15 days to dig a trench 40 metre long, 3 metre wide and 4 metre deep working 8 hours a day, how many men will be required to dig a trench 60 metre long, 8 metre wide and 8 metre deep in 20 days working 12 hours a day.
Answers
Answered by
0
Answer:
80 days
Step-by-step explanation:
Comparing the two cases, by variation,
= \frac{(men \times days \times hours)}{area of the trench}
areaofthetrench
(men×days× hours)
The above equation is equated,
Hence = \frac{(100 \times 24 \times 8)}{(160 \times 6 \times 4)}
(160×6×4)
(100×24×8)
= \frac{(180 \times x \times 10)}{(450 \times 4 \times 3)}=
(450×4×3)
(180×x×10)
x = 80 days.
Similar questions