Math, asked by Pankaj48141, 9 days ago

if 12 men dig 8m trenches in day, how many men will be needed for digging 50m long trench on the same day.

Answers

Answered by ᎷꭱᎪɴꮪꮋ
3

Answer:

75 men will be needed for digging 50m long trench on the same day.

Step-by-step explanation:

8 m trench digging by = 12 men

1 m trench digging by = 12 ÷ 8 = 1.5

Then, 50 m trench digging by = 50 × 1.5

So,50 m trench digging by = 75 men

Answer = 75 men