If 15 boys can finish a piece of work in
12 days of 8 hours a day, then how long
will it take for 16 boys to do a piece of
work 476 as great, working 9 hours a day?
Answers
Step-by-step explanation:
Well, with 3 instead of 15 workers, only one fifth as much of the work can be done per day. Therefor it should take five times as long, or 12×5= 60 days.
ANOTHER METHOD.
Think in terms of man-hours, but change units to suit the problem. There are 12×15 or 180 boy-day of work to be done. But with just 3 boys, it takes 180÷3 or 60 days to do it.
Answer:
This will take five times as long, or 12 × 5 = 60 days.
Step-by-step explanation:
From the above question,
Divide the quantity of work (476) through the range of boys (15) to get the quantity of work every boy ought to do:
476 / 15 = 31.73
Divide the new range of boys (16) via the range of hours they will work every day (9):
sixteen / 9 = 1.78
Multiply the two numbers (31.73 x 1.78) to get the whole range of days required to entire the work:
31.73 x 1.78 = 56.48 (rounded up to 60 days)
Hence ,
This will take five times as long, or 12 × 5 = 60 days.
For more such related questions : https://brainly.in/question/55193818
#SPJ2