if 20 men can build a 112m long wall in 6 days. what will be the length of a similar wall that can be built by 25 men in 3 days.
Answers
Answered by
62
20 men × 6 days = 112m long
120 = 112m long
1 men 1 day= 112/120
1 men 1 day= 0.933 m long (approx)
25 men × 3 days
=> (25×3) × 0.933
=> 75 × 0.933
=> 69.975 m long
The length of wall built using 25 men in 6 days is => 70m long
120 = 112m long
1 men 1 day= 112/120
1 men 1 day= 0.933 m long (approx)
25 men × 3 days
=> (25×3) × 0.933
=> 75 × 0.933
=> 69.975 m long
The length of wall built using 25 men in 6 days is => 70m long
devadakshan:
Make it brainlyliest if it helps u
Answered by
55
HELLO DEAR,
LET THE REQUIRED LENGTH BE x METERS
MORE MEN, More Length Built (DIRECT PROPORTION)
LESS DAYS, LESS LENGTH BUILT
(DIRECT PROPORTION)
MEN, 20 : 25}::
DAYS ,6 : 3}:: 112 : x
=> (20 x 6 x X)=(25 x 3 x 112)
=> x =
Hence, the required length is m.
I HOPE ITS HELP YOU DEAR,
THANKS
LET THE REQUIRED LENGTH BE x METERS
MORE MEN, More Length Built (DIRECT PROPORTION)
LESS DAYS, LESS LENGTH BUILT
(DIRECT PROPORTION)
MEN, 20 : 25}::
DAYS ,6 : 3}:: 112 : x
=> (20 x 6 x X)=(25 x 3 x 112)
=> x =
Hence, the required length is m.
I HOPE ITS HELP YOU DEAR,
THANKS
Similar questions