if 22 men can dig 13(1/2) metre long canal in a day , how many men should be employed for digging 20(1/4) metre long canal of the same type in one day
Answers
Answered by
1
Answer:
ANSWER
11 men dig 6
4
3
mt=
4
27
mt in one day
⇒ 1 man can dig =
4×11
27
=
44
27
mt in one day
∴ 27 metre can be dug by (
27
44
×27) men in one day
⇒ 27 metre long trench of the same type can be dug by 44 men in one day.