Math, asked by yash24614, 6 months ago

if 22 men can dig 13(1/2) metre long canal in a day , how many men should be employed for digging 20(1/4) metre long canal of the same type in one day​

Answers

Answered by bg5950669
1

Answer:

ANSWER

11 men dig 6

4

3

mt=

4

27

mt in one day

⇒ 1 man can dig =

4×11

27

=

44

27

mt in one day

∴ 27 metre can be dug by (

27

44

×27) men in one day

⇒ 27 metre long trench of the same type can be dug by 44 men in one day.

Answered by kumarnitishkulna
1

Answer:

if 22 men can dig 13(1/2) long canal in a day , how many men should be employed for digging 20(1/4) metre long canal of the same type in on day

Similar questions