If 4 over 7 of a ton of concrete covers 7 over 8 of a bridge, how many tons of concrete are required to cover the entire bridge? (5 points)
a
17 over 56 ton
b
3 over 7 ton
c
1 over 2 ton
d
32 over 49 ton
Answers
Answered by
3
Answer:
c is correct 1 over 2 ton.......
Answered by
0
Answer:
d 32 over 49 ton
Step-by-step explanation:
4/7*1000 = 7/8
4*8/7*7 *1000 = 1
32/49 * 1000 = 1
i.e 32/49 ton concrete is required to cover the entire bridge.