If 5 men can cut 50-meter long wire in 5 days, in many days 4 men can cut a 40-meter long wire?
Answers
Answered by
2
Answer:
4 men can cut 40 metre long wire in 4 days
Answered by
0
Answer:
4 men can cut a 40-meter long wire in 3.2 days.
Step-by-step explanation:
If 5 men can cut 50-meter long wire in 5 days.
Then the same 5 men can cut 40-meter long wire in x days. (let's assume.)
Then x = 40 m (5 days)/50 m = 4 days.
Hence, 5 men can cut 40-meter long wire in 4 days.
Now, we are interested in finding how many days 4 men can cut a 40-meter-long wire.
But from the above calculation 5 men can cut 40-meter long wire in 4 days.
So let's assume 4 men can cut a 40-meter long wire in y days.
Then, y = 4 men(4 days)/5 men = 3.2 days.
Therefore, 4 men can cut a 40-meter long wire in 3.2 days.
#SPJ2