if 50 men can complete a work in 6 days how many day will 75 men did the same trendh
Answers
Answered by
0
Answer:
50 men = 6 days
50+25= 75
25=1/5
1.5 of 6 is 3
hence, 6+3 days
9 days
Answered by
0
Answer:
40 days
Step-by-step explanation:
50 men dig the trench in = 60 days
1 man dig the trench in= 60×50 days
= 3000 days
75 men dig the trench in 3000/75 days
= 40 days