Answer:
9days
Step-by-step explanation:
Since 3 men or 9 boys do the work in 21 days, 1 man is equivalent to 3 boys.
The work involved is 9*21 equivalent to 189 boy-days.
So 5 men and 6 boys is the same as 15+6 = 21 boys. So the time taken is 189 boy-days/21 boys = 9 days.