if 8 men can dig a trench in 14 days,how long will 28 men take to dig a similar trench
Answers
Answered by
7
8 men can dig = 14 days
1 man can dig in = 14×8 days
28 men can dig = (14×8 )/28=4 days.
Hope it was helpful. ☺
1 man can dig in = 14×8 days
28 men can dig = (14×8 )/28=4 days.
Hope it was helpful. ☺
Answered by
0
Let the number be x.
Then x = 8 * 14/28
= 4.
28 men will take 4 days to dig a similar trench.
Then x = 8 * 14/28
= 4.
28 men will take 4 days to dig a similar trench.