If 9 trucks can be loaded by workers in 6 3by 4 hours how much time will be taken by the same.number of workers to loaded 4 such trucks
Answers
Answered by
1
Answer:
9 trucks = 63/4 hrs.
1 truck = 63/4 multiplied by 1/9 = 7/4
Therefore, 4 trucks = 7/4 multiplied by 4 = 7
Therefore, it will take 7 hours to load 4 such trucks
Hope it helps !
Answered by
0
Answer:
Step-by-step explanation:
Similar questions