If 9 trucks can be loaded by workers in 6 3by 4 hours how much time will be taken by the same.number of workers to loaded 4 such trucks​

Answers

Answered by Soneybhat17
1

Answer:

9 trucks = 63/4 hrs.

1 truck = 63/4 multiplied by 1/9 = 7/4

Therefore, 4 trucks = 7/4 multiplied by 4 = 7

Therefore, it will take 7 hours to load 4 such trucks