If Risk - Probability of Failure Severity, then is most risky system
a. Antilock braking system
b. Blood oxygen saturation monitoring system
Oc Blood pressure measuring apparatus
Od router in internet
Answers
Answered by
0
Answer:
In general, the possibility of the risk is graded on the basis of the probability of the risk occurring, and the risk severity is grading according to the extra effort or cost resulting from that risk, as is shown in Table 1.
Explanation:
Similar questions