If the length of a portion of a road is 50 m, formation width is 8 m, side slopes 1.5:1, the depth of banking at start point 0.9 m and at end point 0.8 m, the quantity of earthwork involved will be
Answers
Answered by
0
Answer:
qyiwiwghsodiwjuwudidiywhqooeodueghqiwioeodjdjjeie
Answered by
2
Answer:
Step-by-step explanation:
1:5:1
Similar questions