if vije can build 22 tables in 14 days, and perera can build 22 tables in 16 days, approximately how long will it take them to build 22 tables together?

Answers

Answered by raghul36
0

Answer:

hfygnjj

hobbing hj nsjsbsybshnhnjlwndudhycbkow bjxdufswvdkidybdn jzushsnjsxfgdbyiwnohgys jhshsbsbn bhshshdgdbdbdh jdidhddhgdycybdjsoaj

Answered by aneesh235
0

Answer:

The time taken is 7.5 days

Step-by-step explanation:

V=22/14=11/7 tables per day

P=22/16=11/8 tables per day

Together they make 11/7+11/8 per day =165/56 tables per day

To make 22 tables=165/56(22)

(22)56/165=7.5 days

it takes 7.5 days to make build 22 tables together.