(iii) What steps can be taken to control soil erosion in the hilly areas?
Answers
Answered by
0
Answer:
Following steps are taken to control the soil erosion in hilly areas: (i) Contour ploughing: this refers to ploughing along contour lines. (ii) Terrace farming: construction of steps along the hilly areas by cutting the rock layers to reduce the flow of rivers. (iii) Plugging of gullies to prevent gully erosion.
please support me friends ❤️
Answered by
0
Answer:
please make me brainlist
F ollow me
Explanation:
Following steps are taken to control the soil erosion in hilly areas: (i) Contour ploughing: this refers to ploughing along contour lines. (ii) Terrace farming: construction of steps along the hilly areas by cutting the rock layers to reduce the flow of rivers. (iii) Plugging of gullies to prevent gully erosion.
Similar questions