in 2012, the cost of material, labour and overheads increased by 20%, 30% and 10% respectively, calculate the cost of manufacturing in 2012.

Answers

Answered by SnehaG
4
hi mate..

============

in 2012, the cost of material, labour and overheads increased by 20%, 30% and 10% respectively
the cost of manufacturing will be 40 %,60% and 20% respectively as their is double ↑ se in manufacturing