In a hydroelectric power plant, water is available at the rate of 1.864 m3/sec with an available head of 250 m. The turbines run at a speed of 250 rpm with 70% efficiency. Considering the plant load factor of 0.5, determine
Available power
Type of turbine to be selected & the total number of turbines required