In a rerolling process 2 blowers are connected to reheat the furnace using pulverized coal. One of the blowers is standby equipment. The blower system includes: stator, motor, coupling and blower with the following reliabilities: 0.9, 0.92, 0.85 and 0.95 respectively. The pulverized coal system has a reliability of 0.99 and the furnace 0.95 for an operating period of 150 hours. Draw the system configuration and determine the reliability of the total system for 150 hours of operation.