Math, asked by RaviRoyal2319, 9 months ago

In boring a well 50m deep the cost is rs.100 for first meter. the cost of each successive meter increases by Rs.50 .what is the cost of borinh the entire well

Answers

Answered by mahisagar27
2

Answer:

then..........................

Answered by knjroopa
5

Step-by-step explanation:

Given In boring a well 50 m deep the cost is rs.100 for first meter. the cost of each successive meter increases by Rs.50 .what is the cost of boring the entire well

  • For successive meters the cost of boring will be 100,150, 200,250……
  • Now n = 50, a = 100, and d = 50
  • So sum to n terms of series is given by  
  • Sn = n/2 (2a + (n – 1) d )
  •      = 50/2 (2(100) + (50 – 1) 50)
  •     = 25 (200 + 49 x 50)
  •     = 25 (200 + 2450)
  •      = 25 x 2650
  •      = 66,250

So the cost of boring entire well will be Rs 66,250

Reference link will be

https://brainly.in/question/140013