Computer Science, asked by Iqrakafeel8260, 1 year ago

In waterfall model of systems development which activities are not normally part of the systems implementation phase

Answers

Answered by baseit
0

Answer:

This phase is concerned with the physical construction of the software as set out in the design stage. This is normally done by a development team that consists of programmers, interface designers and other specialists. As well as developing working and reliable software, this phase also documents work that has been done to date and provides help for current and intended users of the system. There are 6 key activities in this stage. Coding which is where the physical design specifications are turned into working computer code. Testing is performed in parallel with coding to confirm that the system meets the requirements set out. This can be done by inspection, walk through or unit testing. Installation where the current system is replaced by the new one. There are four ways in which this can be done.

Explanation:

1. Direct installation, where the new system is installed and made operational immediately and any old systems are turned off.

1. Direct installation, where the new system is installed and made operational immediately and any old systems are turned off.2.Parallel Installation, here the old and new system run side by side until it is decided that the old one can be turned off.

1. Direct installation, where the new system is installed and made operational immediately and any old systems are turned off.2.Parallel Installation, here the old and new system run side by side until it is decided that the old one can be turned off.3.Single-Location Installation,where the new system is used in only one site and deciding based on the experienced how it should be implemented in its entirety.

1. Direct installation, where the new system is installed and made operational immediately and any old systems are turned off.2.Parallel Installation, here the old and new system run side by side until it is decided that the old one can be turned off.3.Single-Location Installation,where the new system is used in only one site and deciding based on the experienced how it should be implemented in its entirety.4. Phase Installation, which changes from the old to the new system bit by bit until the system is replaced entirely.