Math, asked by sagarkumar22238, 2 months ago

Instruction: Rajeev has a square plot of side 300 m.
Q.10 Find the cost of leveling it, if the rate of leveling is 71.32 per square meter.
. Ta) 118800
(b) 90000
(c) 118008
(d) None of above


answer is
90000​

Answers

Answered by harilalbind198684
0

Answer:

The cost of levelling it is Rs.45000

Step-by-step explanation:

One side of a square plot is 300m

Area of square plot = Side^2 = 300^2 = 90000 m^2Side

2

=300

2

=90000m

2

Cost of leveling 1 sq.m. = Rs.0.50

Cost of leveling 90000 sq.m. =Rs.0.50 \times 90000Rs.0.50×90000

= Rs.45000

Hence the cost of levelling it is Rs.45000

#Learn more;

Find the area square plot ewhose perimeter is 300m

Similar questions