Science, asked by kantale7, 7 months ago

is the account of work done or supply of materials made, and included the particulars and quantities of work done or material supplied their rates and
amount. (civil engineering)

Answers

Answered by rahul488977
4

Answer:

and included the particulars and quantities of work done or material supplied their rates and

amount. (civil engineering)

Answered by Sahil3459
0

Answer:

By figuring out the quantities and costs of everything, a detailed estimate of the project's cost may be created.

Explanation:

The written requirements for a material, good, or service for a planned project, such as a machine, building, or bridge, are known as specifications. The specifications are part of the contract documents for architectural projects, together with the drawings, the bidding requirements, and the construction requirements. The duties of the site engineer include managing various aspects of construction projects, overseeing crews, creating time and material cost estimates, finishing quality assurance, adhering to health and safety regulations, and compiling reports for various stakeholders. You must multiply the construction's overall centre line length by the width and depth to determine the necessary material quantities.

Thus, it often only applies to maintenance and monetary-generating projects. With this approach, labor-rate contracts are also used to carry out the work.

Similar questions