ISRO is considering expansion of existing facility by
adding 1 ton capacity of curing furnace for manufacturing
solid propellant. Each batch on 1 ton propellant must
undergo 30 minutes of furnace time, including loading
and unloading operations. Due to power restrictions, the
furnace is used only for 80% of the time. In a shift of
8 hours, the required output is to be 16 tonnes.If the
plant system estimated is 40% of system capacity,
determine the number of furnaces required
Answers
Answered by
0
Answer:
4 hours 8 tons is the answer
Explanation:
hey you asked that furnace is 40percent then whet it is 80percent it is doubled to 16 tons so 40 will be 8
mjamja306:
Hey Hope My Answer Helps You !