It is necessary to loosen the soil by ploughing before sowing seeds. Why it is necessary to level the soil after ploughing ?
Answers
Answered by
24
It is necessary so that to break or crush bigger chunks of dry soil into smaller pieces
protect upper layer of the soil from erosion by wind or water
prevent water logging and promote uniform irrigation
protect upper layer of the soil from erosion by wind or water
prevent water logging and promote uniform irrigation
Answered by
3
Answer:
Explanation:
The process of loosening and turning of the soil is called tilling or ploughing.
Similar questions